Dodd Boulevard is an important transportation corridor in Lakeville, connecting neighborhoods, businesses, schools, parks, and trails. The section between 202nd St/Kenwood Trail (CSAH 50) and 208th Street is a rural section without stormwater collection systems or treatment measures. The Lake Marion Greenway Trail crosses Dodd Boulevard at-grade near Marion Fields Park. The City of Lakeville and Dakota County are partnering to study and evaluate upgrades to Dodd Boulevard that will improve traffic capacity and operations, enhance intersection safety, and provide upgrades for non-motorized transportation.

Project Goals

  • Reconstruct and modernize Dodd Boulevard (CSAH 9) between Kenwood Trail and Huntsville Trail/208th Street West
  • Improve opportunities for non-motorized recreation and transportation through added trails and accessibility enhancements
  • Study options to improve safety at the Lake Marion Greenway Trail crossing, including possible grade separation
  • Evaluate intersection improvements at Dodd Boulevard and Kenwood Trail/202nd Street
  • Collect storm water runoff and provide water quality improvements through stormwater best management practices
    map of project area along Dodd Road from 202nd street to 208 street

    Project area

    Timeline

    • Timeline item 1 - incomplete

      Discover (May to July 2025)

      Gather data and study existing conditions along the corridor. Gather feedback at Open House #1 on issues and challenges that residents and corridor users are observing.

    • Timeline item 2 - incomplete

      Develop (July to October 2025)

      Using data and feedback gathered in Discover phase, develop potential design solutions. Design options will be shared at Open House #2 in fall 2025.

    • Timeline item 3 - incomplete

      Design (October 2025 to Fall 2026)

      Advance the preferred alternative identified in the Develop phase through detailed design. Any identified land acquisition from private property will occur during this phase as well.

    • Timeline item 4 - incomplete

      Construction (Expected Spring 2027)

      Timeframe for construction will depend on design process and any needed land acquisition. Updates will be provided as the project advances.